We've encountered this post on A Step-by-Step Guide to Installing a Bathtub listed below on the net and figured it made sense to share it with you here.

Mounting a bath tub isn't exactly rocket science, yet it does require solid plumbing, carpentry, and also occasionally, tiling skills. Replacing an old bath tub with a new one is also a moderately difficult task. If the old tub is easily available, the project can move speedily; if you have to open a wall surface to eliminate the old bathtub and also place the brand-new tub, the job is a lot harder. In either situation, the project is within a residence handyman's skills, although you will certainly need a helper to vacate the old tub and also embeded in the brand-new one. See to it you have certified yourself for the job and fit trying it. As opposed to working with a specialist to take over a halfway-completed job, it is far better to think about employing one before you start. Chances are you may need a specialist plumber to make tube links.
This article will certainly assist you install a brand-new tub in your bathroom if you have currently bought a new bathtub and also don't require to transform the plan of your previous supply of water pipes.
Your tools as well as material checklist ought to comprise the following:
Removing Old Taps
If you require to change old taps with new ones as a part of your installation, then the first thing you should do is disconnect the water. After doing so, switch on the taps to drain any water continuing to be in the system. The process of getting rid of the existing taps can be rather troublesome because of the limited access that is often the instance.
Utilize a container wrench (crowsfoot spanner) or a faucet tool to reverse the nut that attaches the supply pipelines to the faucets. Have a towel ready for the remaining water that will certainly originate from the pipes. As soon as the supply pipelines have been removed, utilize the exact same device to loosen the nut that holds the taps onto the bath/basin. You will certainly require to stop the single faucets from turning during this procedure. Once the taps have actually been eliminated, the holes in the bath/basin will have to be cleaned up of any type of old sealing substance.
Prior to proceeding to fit the new taps, contrast the pipeline connections on the old faucets to the new taps. If the old taps are longer than the brand-new faucets, after that a shank adapter is needed for the new taps to fit.
Fitting New Touches
If the tails of the brand-new taps are plastic, then you will certainly require a plastic port to prevent damage to the string. One end of the port fits on the plastic tail of the faucet and the various other end provides a link to the existent supply pipes.
If you require to fit a monobloc, after that you will need minimizing couplers, which connects the 10mm pipe of the monobloc to the basic 15mm supply pipeline.
Next off, place the tap in the installing hole in the bath/basin guaranteeing that the washers remain in location in between the faucet as well as the sink. Secure the faucet in place with the supplier given backnut. As soon as the tap is securely in place, the supply pipelines can be linked to the tails of the faucets. The faucets can either be attached by using corrugated copper piping or with typical faucet adapters. The former type ought to be connected to the faucet ends initially, tightening just by hand. The supply pipes can later on be linked to the various other end. Tighten up both ends with a spanner after both ends have been connected.
Mounting the Bathtub
Utilizing the two wooden boards under its feet, place the bath tub in the called for setting. The wood boards are valuable in evenly spreading out the weight of the bathtub over the location of the boards as opposed to concentrating all the weight onto 4 tiny points.
The next objective is to make sure that the bath tub is leveled all round. This can be accomplished by examining the level as well as changing the feet on the bath tub until the spirit level checks out degree.
To set up faucets, fit all-time low of the outermost adaptable faucet connector to the appropriate supply pipe by making a compression join; then do the same for the other tap.
Switch on the water system and also inspect all joints as well as new pipework for leakages and tighten them if needed. Load the bathtub and likewise examine the overflow electrical outlet and also the typical electrical outlet for leaks.
Ultimately, fix the bathroom paneling as explained in the maker's instruction manual. Tiling and also sealing around the bathtub should wait till the tub has been utilized at least when as this will settle it right into its final setting.
Planning for the Installation
To start with, the supporting frame provided with the bathroom must be fitted (if needed) according to the producer's guidelines. Next off, fit the faucets or mixer to the tub. When suitable the faucet block, it is very important to see to it that if the tap comes with a plastic washing machine, it is fitted between the bathroom and also the taps. On a plastic bathroom, it is also sensible to fit a sustaining plate under the taps unit to stop pressure on the tub.
Fit the versatile faucet connectors to the bottom of the two taps making use of 2 nuts and also olives (sometimes supplied with the tub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink outlet opening, and afterwards pass the electrical outlet via the hole in the bath. Utilize the nut supplied by the supplier to fit the plug-hole. Examine the plug-hole electrical outlet for an inlet on the side for the overflow pipeline.
Next off, fit the end of the flexible overflow pipe to the overflow outlet. After that, screw the pipe to the overflow face which ought to be fitted inside the bathroom. Ensure you use all of the supplied washers.
Connect the trap to the bottom of the waste outlet on the bathtub by winding the thread of the waste outlet with silicone mastic or PTFE tape, and screw on the catch to the outlet. Link all-time low of the overflow tube in a comparable manner.The bathroom must currently prepare to be fitted in its last placement.
Tiling Around the Bath tub
In the area where the bathroom fulfills the floor tile, it is essential to secure the accompanies a silicone rubber caulking. This is essential as the fitting can relocate enough to fracture a rigid seal, creating the water to pass through the wall surface between the bath and the tiling, bring about difficulties with wetness as well as possible leaks to the ceiling listed below.
You can pick from a range of coloured sealants to assimilate your components and also fittings. They are sold in tubes and also cartridges, as well as can securing gaps approximately a width of 3mm (1/8 inch). If you have a bigger space to fill, you can load it with twists of drenched paper or soft rope. Bear in mind to constantly fill the bathtub with water before sealing, to allow for the movement experienced when the tub is in use. The sealant can break relatively early if you do not take into consideration this motion prior to sealing.
Additionally, ceramic coving or quadrant ceramic tiles can be used to border the bathroom or shower tray. Plastic strips of coving, which are easy to use as well as cut to dimension, are additionally conveniently offered on the market. It is advisable to fit the floor tiles utilizing water-resistant or waterproof adhesive and also cement.
How to Install or Replace a Bathtub
Find Your Dimensions
The first step in any bathtub installation or replacement is to select the right size tub for your bathroom. Start by measuring your existing bathtub’s alcove from wall to wall. The standard size for bathtubs is around 5 feet long and 30 or 32 inches wide. Purchase the size that’s closest to your previous tub.
After you’ve measured, you’ll need to figure out what type of tub you need. Face the alcove. If the drain is on the right-hand side, you’ll need a right drain tub. If it’s on the left, get a left drain tub. Easy enough, right?
Disconnect the Water Supply and Drain Assembly
Before you can start on your removal, make sure that you turn off the tub’s water supply. Some bathrooms have a shutoff valve, but if you don’t see one, you’ll need to turn off the supply at your house’s water main. Once the water’s off, open the valves to release any remaining air in the supply lines.
Then, disconnect the tub drain flange. This process varies based on the type of drain you have, but in most cases, you’ll need a drain flange removal tool to perform this task. If you’re feeling handy, you might be able to use a pair of needle-nose pliers to twist and pull the flange.
Now comes the fun part. In order to disconnect the drain assembly, you’ll need to be able to get to the space underneath the tub. You might need to access the tub drain from a crawlspace or a basement. Don’t forget to take a pipe wrench with you, as you’ll need it to loosen the pipe at the connection.
Cut Out the Old Tub
After removing the drainpipe assembly, you can take out the old bathtub. Cut a strip above the tub edge in the wall surrounding the bathtub that's about 6 inches in height. The tools you need here may vary depending on the type of wall surround you have in the alcove. If you’re cutting drywall, use a drywall saw and remove the section of the wall all the way down to the studs. If you have tile, you’ll need to use a grinder with a diamond blade to cut through the grout line. Then, use a chisel to remove the individual tiles. Take care here not to cut through any studs.
Find the tub flange. Remove the screws that attach the flange to the studs in the wall. At this point, the tub should be freed from the wall.
Once you’ve removed the flange, use a utility knife to cut away the caulk between the tub and the floor. When this is done, you should be able to lift the tub up and out of the alcove. Keep in mind that, depending on what it’s made of, the old tub could be tremendously heavy. You should plan to have a friend help you move it just in case.
Install the New Tub
Before you make any adjustments to the area, place the new tub in the alcove to make sure it fits properly and that the tub drain lines up with the P-trap underneath the floor.
Remove it and install a 2 x 4 ledger board. Measure the tub’s flange, then mark that height on the wall. Screw the ledger board to studs in the wall. This will help to support the weight of the tub.
Once the ledger board has been installed, go ahead and secure the drain to the tub. For this step, you’ll need some plumber’s putty. Roll a small amount of putty in your hands and wrap it around the underside of the drain flange. Push the drain into the tub from underneath the tub.
When the drain has been attached, connect the overflow drain. To do this, you’ll place the gasket on the overflow elbow and move it behind the tub. Once that’s on, connect the overflow pipe and the drainpipe, but take care not to overtighten.
Secure the Tub
After the connections are in, it’s time to set the tub in place. Before you start, make sure the flange lines up with the markings you made in Step 4. Because the ledger board holds the tub in place, it’s important that it matches up. If not, you’ll need to remove it and readjust.
Once your measurements line up, attach the flange to the studs on all three sides of the wall. Please note that you should not screw the flange to the wall. Instead, you should use roofing nails because they won’t rust over time. When the tub is in place, install the baseboard and the molding in front of and around the tub.
Repair and finish off the drywall or tile that you cut in Step 3. If you’re installing a fiberglass bath surround, now’s the time to adhere it to the alcove.
Then, enjoy your tub! While all these steps might seem intimidating, removing and installing a new bathtub is a relatively easy DIY project that can be completed in a single day. And now, when you settle in for your next bubbly soak, you can enjoy your bath without the distraction of a tub in disrepair.
https://www.homeserve.com/en-us/blog/how-to/bathtub-replacement/

Do you really like more info about Installing A Bathtub? Create feedback directly below. We will be interested to see your opinion about this blog posting. Hoping to see you back again later on. Enjoyed our piece of writing? Please share it. Let others check it out. Thanks for taking the time to read it.
Pipe burst? Phone now!